Limited Time SaleUS$41.99 cheaper than the new price!!
| Management number | 210771579 | Release Date | 2026/04/02 | List Price | US$28.00 | Model Number | 210771579 | ||
|---|---|---|---|---|---|---|---|---|---|
| Category | |||||||||
Worth Garden Hoses are ideal for indoor and outdoor use, especially for gardening, farming activities. High-quality with solid aluminum fittings and PVC material allows to used for tough watering chores and industrial water in all weather. It resilient built allows this garden hose easy to use in the driveway, garden, to drain a pool for winter, to flush the water heater. It is a good basic piece to have in your garden.
| Color | Black |
|---|---|
| Brand Name | Worth |
| Unit Count | 1.0 Count |
| Item Length | 1200 Inches |
| Manufacturer | Worth Garden |
| Material Type | PVC |
| Maximum Pressure | 290 Pound per Square Inch |
| Outside Diameter | 0.63 Inches |
| Included Components | garden hose |
| Item Dimensions L x W | 1200"L x 0.63"W |
If you notice any omissions or errors in the product information on this page, please use the correction request form below.
Correction Request Form